Bridges - Køge Universitetshospital

Supplied and installed 3 bridges between 4 buildings.  Buildings B1-B8, B6-B8, B6-B2  were connected with bridges 20 meters from ground level. 

Steel structures are produced and coated with intumescent paint in R30 requirement. 

Bridges were installed in 3 piece sections due to at that time progress of buildings.